[1]赵晓晋,贺拴海,李源,等.斜拉桥前支点挂篮施工过程模拟分析[J].深圳大学学报理工版,2017,34(2):138-146.
 Zhao Xiaojin,He Shuanhai,Li Yuan,et al. Simulate analysis of fore fulcra form travelers construction process for cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2017,34(2):138-146.
点击复制

斜拉桥前支点挂篮施工过程模拟分析()
分享到:

《深圳大学学报理工版》[ISSN:1000-2618/CN:44-1401/N]

卷:
第34卷
期数:
2017年第2期
页码:
138-146
栏目:
土木建筑工程
出版日期:
2017-03-20

文章信息/Info

Title:
 Simulate analysis of fore fulcra form travelers construction process for cable-stayed bridge
作者:
 赵晓晋贺拴海李源袁浩允
 长安大学公路学院,旧桥检测与加固技术交通行业重点实验室, 陕西西安 710064
Author(s):
 Zhao Xiaojin He Shuanhai Li Yuan and Yuan Haoyun
 Highway College, Key Laboratory of Bridge Detection Reinforcement Technology Ministry of Communication, Chang’an University, Xi’an 710064, Shaanxi Province, P.R.China
关键词:
 结构工程斜拉桥前支点挂篮施工过程施工控制中间索力模拟分析变形和受力状态施工预拱度
Keywords:
 structural engineering cable-stayed bridge form travelers with fore fulcra construction stage construction control interim cable forces simulation analysis deformation and stress state construction camber
分类号:
U 442;U 448.27
文献标志码:
A
摘要:
 为明确前支点挂篮施工斜拉桥施工过程中挂篮变形及受力状态,针对影响施工控制精度的节段施工中间张拉过程与前支点挂篮密切相关的问题,基于前支点挂篮受力分析及MIDAS CIVIL有限元模拟,提出了中间张拉索力计算公式及挂篮参与整体受力及变形的9步施工过程模拟分析方法,并与实际工程中结构受力状态和变形状态进行了对比分析.结果表明,根据这种施工过程模拟分析得到的施工预拱度、中间张拉过程理论高程及内力状态满足施工控制精度的要求,可用于指导实际工程.
Abstract:
 In order to determinate the deformation and stress state of travelers in the construction stage of cable-stayed bridges constructed by fore fulcra form travelers, and consider the fact that the tensioning process in the construction stage, which influences the construction control precision, is closely related to the fore fulcra form travelers, we put forward the formula of the cable forces together with nine steps of construction simulation analysis method based on mechanical analysis and finite element analysis with MIDAS CIVIL of fore fulcra form travelers. We consider the travelers bear force and deform as a part of the whole structure, and then compare the stress state and deformation state in the model to those in practical engineering. The results show that the construction camber, theoretical evaluation and internal force state in tensioning process obtained by this construction simulation analysis method meet the accuracy requirement in construction control. The method can be used to guide practical engineering.

相似文献/References:

[1]朱美春,刘建新,王清湘.钢骨-方钢管高强混凝土柱的轴压比限值[J].深圳大学学报理工版,2010,27(1):95.
 ZHU Mei-chun,LIU Jian-xin,and WANG Qing-xiang.Axial load limit for square steel tubes filled with steel-reinforced high-strength concrete[J].Journal of Shenzhen University Science and Engineering,2010,27(2):95.
[2]周海俊,米红雨,谭也平.锈蚀-疲劳作用下的砼梁桥失效概率分析[J].深圳大学学报理工版,2010,27(1):109.
 ZHOU Hai-jun,MI Hong-yu,and TAN Ye-ping.Failure probability analysis of reinforced concrete bridges under coupled corrosion fatigue effects[J].Journal of Shenzhen University Science and Engineering,2010,27(2):109.
[3]白音,石永久,王元清.火灾中网架结构受力分析与设计方法[J].深圳大学学报理工版,2011,28(No.2(095-188)):113.
 BAI Yin,SHI Yong-jiu,and WANG Yuan-qing.Mechanical properties analysis and design method for grid structures under fire conditions[J].Journal of Shenzhen University Science and Engineering,2011,28(2):113.
[4]管民生,韩大建,杜宏彪,等.钢筋混凝土框架结构的抗震性能指标研究[J].深圳大学学报理工版,2011,28(No.3(189-282)):200.
 GUAN Min-sheng,HAN Da-jian,DU Hong-biao,et al.A new seismic performance index for reinforced concrete frame structures[J].Journal of Shenzhen University Science and Engineering,2011,28(2):200.
[5]蔡健,林焕彬,侯磊,等.带约束拉杆矩形钢管混凝土短柱延性分析[J].深圳大学学报理工版,2011,28(No.3(189-282)):213.
 CAI Jian,LIN Huan-bin,HOU Lei,et al.Analysis of ductility of rectangular concrete-filled steel tube stub columns with binding bars subjected to eccentric loading[J].Journal of Shenzhen University Science and Engineering,2011,28(2):213.
[6]方明霁,李国强,李一松.型钢混凝土中高剪力墙的抗震性能[J].深圳大学学报理工版,2012,29(No.1(001-094)):38.[doi:10.3724/SP.J.1249.2012.01038]
 FANG Ming-ji,LI Guo-qiang,and LI Yi-song.Seismic behavior of steel reinforced concrete mid-rise shear wall[J].Journal of Shenzhen University Science and Engineering,2012,29(2):38.[doi:10.3724/SP.J.1249.2012.01038]
[7]蔡健,梁伟盛,林辉.方钢管混凝土柱抗剪性能试验研究[J].深圳大学学报理工版,2012,29(No.3(189-282)):189.[doi:10.3724/SP.J.1249.2012.03189]
 CAI Jian,LIANG Wei-sheng,et al.Experimental study on shear resistance performance of concrete filled square steel tubular columns[J].Journal of Shenzhen University Science and Engineering,2012,29(2):189.[doi:10.3724/SP.J.1249.2012.03189]
[8]张成,吴慧,高博青,等.肋环型索穹顶结构的几何法施工及工程应用[J].深圳大学学报理工版,2012,29(No.3(189-282)):195.[doi:10.3724/SP.J.1249.2012.03195]
 ZHANG Cheng,WU Hui,GAO Bo-qing,et al.Geometry-based construction technique and application of Geiger type cable dome[J].Journal of Shenzhen University Science and Engineering,2012,29(2):195.[doi:10.3724/SP.J.1249.2012.03195]
[9]陆金钰,李娜,范圣刚.面向几何坐标的张拉整体结构找形算法[J].深圳大学学报理工版,2012,29(No.3(189-282)):211.[doi:10.3724/SP.J.1249.2012.03211]
 LU Jin-yu,LI Na,and FAN Sheng-gang.Geometry-oriented form-finding method for tensegrity[J].Journal of Shenzhen University Science and Engineering,2012,29(2):211.[doi:10.3724/SP.J.1249.2012.03211]
[10]傅学怡,徐娜.新型矩形钢管混凝土柱节点轴压传力机制研究[J].深圳大学学报理工版,2012,29(No.4(283-376)):283.[doi:10.3724/SP.J.1249.2012.04283]
 FU Xue-yi and XU Na.Research on axial compression force transmission mechanism of a new form of concrete-filled rectangular steel tube column joint[J].Journal of Shenzhen University Science and Engineering,2012,29(2):283.[doi:10.3724/SP.J.1249.2012.04283]

更新日期/Last Update: 2017-03-03