[1]杨仕若,曾庆元.桁段有限元法分析钢桁梁桥振动[J].深圳大学学报理工版,2011,28(No.3(189-282)):195-199.
 YANG Shi-ruo and ZENG Qing-yuan.Analysis of steel truss girder bridge vibrations by finite truss element method[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):195-199.
点击复制

桁段有限元法分析钢桁梁桥振动()
分享到:

《深圳大学学报理工版》[ISSN:1000-2618/CN:44-1401/N]

卷:
第28卷
期数:
2011年No.3(189-282)
页码:
195-199
栏目:
土木建筑工程
出版日期:
2011-05-20

文章信息/Info

Title:
Analysis of steel truss girder bridge vibrations by finite truss element method
文章编号:
1000-2618(2011)03-0195-05
作者:
杨仕若1曾庆元2
1)中南林业科技大学土木工程与力学学院,长沙 410004
2)中南大学土木建筑学院,长沙 410075
Author(s):
YANG Shi-ruo1 and ZENG Qing-yuan2
1)College of Civil Engineering and Mechanics, Central South University of Forestry and Technology, Changsha 410004, P.R.China
2)School of Civil Engineering and Architecture, Central South University, Changsha 410075, P.R.China
关键词:
桥梁工程有限元振动方程车桥系统刚度舒适度指标
Keywords:
bridge engineeringfinite elementvibration equationvehicle -bridge system stiffnesssperling value
分类号:
U 441.3
文献标志码:
A
摘要:
将列车-钢桁梁桥作为整体振动系统,钢桁梁桥采用桁段有限元法离散,列车采用具有23个自由度的二系弹簧车辆空间振动模型,得到系统振动的矩阵方程.以桥上实测蛇形波作为激振源,分别计算了旅客列车以80 、100和120 km/h,货物列车以 60 和 80 km/h车速通过某连续梁桥时车桥系统的振动响应,与传统有限元法相比,桁段有限元法能更好地处理钢桁梁桥中的桥门架单元.对某3×64 m连续梁桥的车桥振动进行分析表明,其Sperling 指标、脱轨系数和减载率均在安全行车范围内,行车安全有保障,舒适度和车辆平稳性指标均达合格以上.
Abstract:
The train and the continuous truss girder bridge were taken as one composite system.The steel truss bridge was discretized by the finite truss element method,and the train was treated by the two-stage suspension vehicle space dynamic model with 23 degrees of freedom.The measured hunting curves of bogie were taken as excitation,and the vibration responses of train and bridge were calculated when passenger train past through a continuous truss girder bridge at 80 km/h,100 km/h,and 120 km/h,and goods train past through the bridge at 60 km/h and 80 km/h.Compared with the traditional finite element method,finite truss element method can deal better with the bridge frame units of steel truss bridges.The analysical results of a 3×64 m continuous truss bridge show that the Sperling index,derailment coefficients,and unloading rates are within safety range.The transportation safety is guaranteed,and comfort level and vehicle smoothness index meet the requirements.

参考文献/References:

[1] 李小珍,蔡青,强士中.京沪高速铁路南京长江大桥列车走行性分析[J].工程力学,2003,20(6):86-92.
[2] 楼梦麟,洪婷婷.预应梁横向振动分析的模态摄动方法[J].工程力学,2006,23(1):107-111.
[3] 周峰,危韧勇,李志勇.一种基于小波神经网络的车辆构架人工蛇形波重构方法研究[J].铁道学报,2009,31(3):50-53.
[4] Tan G H,Brameld G H.处理车桥相互作用分析模态的进展[J].工程结构,1998,20:54-61.(英文版)
[5] 曾庆元,郭向荣.列车桥梁时变系统振动分析理论与应用[M].北京:中国铁道出版社,1999.
[6] 张楠,夏禾.京沪高速铁路南京大胜长江大桥风-车-桥耦合振动分析[J].中国铁道科学, 2009,30(1):41-48.
[7] 俞博,叶见曙.装配式混凝土铰接板桥缝剪力计算[J].深圳大学学报理工版,2011,28(1):60-64.
[8] 李宏江,张劲泉,李万桓,等.PC斜拉桥辅助墩拉力摆断裂后的状态模拟[J].深圳大学学报理工版,2010,27(3):280-285.
[9] 张鹤,张治成,谢旭,等. 月牙形多拱肋钢管混凝土桁架拱桥动力冲击系数研究[J].工程力学,2008,25(7):118-124.
[10] 杨仕若,曾庆元.拱桁组合体系桥车桥振动分析的模态法[J].噪声与振动控制,2011,31(1):77-80.
[11] 曾庆元,向俊,娄平.车桥及车轨时变系统横向振动计算中的根本问题与列车脱轨能量分析理论[J].中国铁道科学, 2002,23(1):1-10.
[12] 赫丹,向俊.弹性支承块式轨道在高速列车作用下的动力响应分析[J].中南大学学报自然科学版,2010,41(2):770-774.
[13] 陈锐林,曾庆元.横风对列车通过曲线限制速度的数值研究[J].铁道学报,2009,31(1):40-45.



[1] LI Xiao-zhen,CAI Qing,QIANG Shi-zhong.Train run ability of the schemed Beijing-Shanghai high-speed rail way on the Nanjing Yangtze-river bridge[J].Engineering Mechanics,2003,20(6):86-92.( in Chinese)
[2] LOU Meng-lin,HONG Ting-ting.Mode perturbation method for lateral vibration analysis of pretested beams[J].Engineering Mechanics,2006,23(1):107-111.(in Chinese)
[3] ZHOU Feng,WEI Ren-yong,LI Zhi-yong.Research of rebuilding artificial crawl waves of vehicle frames by wavelet neural networks[J].Journal of the China Railway Society,2009,31(3):50-53.( in Chinese)
[4] Tan G H,Brameld G H.Development of an analytical model for treating bridge-vehicle interaction[J].Eng Structures,1998,20:54-61.
[5] ZENG Qing-yuan,GUO Xiang-rong.Theory of Vibration Analysis of Train-bridge Time-variant System and Its Application[M].Beijing:Chang Railway Publishing House,1999.(in Chinese)
[6] ZHANG Nan,XIA He.Analysis on the wind-bridge coupling vibration for Nanjing Dashengguan Yangtze River bridge of Bejing-Shanghai high-speed rail way[J].China Railway Science,2009,30(1):41-48.(in Chinese)
[7] YU Bo,YE Jian-shu.Transverse shear of fabricated concrete articulated plate bridge[J].Journal of Shenzhen University Science and Engineering,2011,28(1):60-64.(in Chinese)
[8] LI Hong-jiang,ZHANG Jin-quan,LI Wan-huan,et al.Simulation on the state after fracture of tension rocker bearing cables at auxiliary piers in a PC cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2010,27(3):280-285.(in Chinese)
[9] ZHANG He, ZHANG Zhi-cheng, XIE Xu, et al. Theoretical study on the impact factor of crescent-shaped multi-rib concrete filled steel tube truss arch bridges[J].Engineering Mechanics, 2008,25(7):118-124.(in Chinese)
[10] YANG Shi-ruo,ZENG Qing-yuan.Vehicle-bridge vibration analysis of arch-truss composite bridge using mode method[J].Noise and Vibration Control,2011,31(1):77-80.(in Chinese)
[11] ZENG Qing-yuan,XIANG Jun,LOU Ping.Fundamental problems in calculation of transverse vibration of train-bridge and train-track time-track time-varying system and theory of energy random analysis for train derailment[J].China Railway Science,2002,23(1):1-10.(in Chinese)
[12] HE Dan,XIANG Jun.Dynamic response analysis of low vibration truck subjected to high-speed train[J]. Journal of Central South University Science and Technology,2010,41(2):770-774.(in Chinese)
[13] CHEN Rui-lin,ZENG Qing-yuan.Numerical study on the limit speed when a train negotiates curved rails under side wind[J].Journal of the China Railway Society,2009,31(1):40-45.(in Chinese)

相似文献/References:

[1]刘爱荣,禹奇才,张俊平.大跨度连续刚架拱桥的地震响应研究[J].深圳大学学报理工版,2007,24(3):228.
 LIU Ai rong,YU Qi cai,and? ZHANG Jun ping.Seismic response of long span continuous rigidframe arch bridge[J].Journal of Shenzhen University Science and Engineering,2007,24(No.3(189-282)):228.
[2]谭毅平,韩大建.预应力混凝土箱梁桥日照温度效应研究[J].深圳大学学报理工版,2008,25(1):43.
 TAN Yi-ping and HAN Da-jian.Study on solar temperature effect of prestressed concrete box-girder bridge[J].Journal of Shenzhen University Science and Engineering,2008,25(No.3(189-282)):43.
[3]刘伟,丁发兴,邢锋.基于组合单元的圆钢管混凝土结构非线性分析[J].深圳大学学报理工版,2009,26(3):301.
 LIU Wei,DING Fa-xing,and XING Feng.Nonlinear finite element analysis of concrete filled circular steel tubular structures based on composite element method[J].Journal of Shenzhen University Science and Engineering,2009,26(No.3(189-282)):301.
[4]程睿,何井运,黄宗明,等.单角钢螺栓连接节点板拉剪性能研究[J].深圳大学学报理工版,2009,26(4):382.
 CHENG Rui,HE Jing-yun,HUANG Zong-ming,et al.Study on tension and block shear behavior of bolted single angle-gusset plates[J].Journal of Shenzhen University Science and Engineering,2009,26(No.3(189-282)):382.
[5]李宏江,张劲泉,李万恒,等.PC斜拉桥辅助墩拉力摆断裂后的状态模拟[J].深圳大学学报理工版,2010,27(3):280.
 LI Hong-jiang,ZHANG Jin-quan,LI Wan-heng,et al.Simulation on the state after fracture of tension rocker bearing cables at auxiliary piers in a PC cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2010,27(No.3(189-282)):280.
[6]韩振峰,叶爱君.桥梁群桩基础抗震能力值灵敏性分析[J].深圳大学学报理工版,2010,27(4):452.
 HAN Zhen-feng and YE Ai-jun.Sensitivity analysis on antiseismic capacity of bridge pile foundation[J].Journal of Shenzhen University Science and Engineering,2010,27(No.3(189-282)):452.
[7]罗帅,刘红军,王刚.考虑桥面运动的斜拉索减振模型[J].深圳大学学报理工版,2010,27(4):470.
 LUO Shuai,LIU Hong-jun,and WANG Gang.The characteristic of stay-cable damping system in consideration of bridge deck vibration[J].Journal of Shenzhen University Science and Engineering,2010,27(No.3(189-282)):470.
[8]俞博,叶见曙,张剑,等.装配式混凝土铰接板桥铰缝剪力计算[J].深圳大学学报理工版,2011,28(No.1(001-095)):60.
 YU Bo,YE Jian-shu,ZHANG Jian,et al.Transverse shear of fabricated concrete articulated plate bridge[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):60.
[9]杨仕若,曾庆元.铁路车桥耦合振动模态法分析[J].深圳大学学报理工版,2011,28(No.2(095-188)):131.
 YANG Shi-ruo and ZENG Qing-yuan.Coupling vibration analysis of vehicle-bridge by mode method[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):131.
[10]诸葛萍,强士中,任伟平,等.碳纤维主缆鞍座处抗滑移试验[J].深圳大学学报理工版,2011,28(No.5(377-470)):395.
 ZHUGE Ping,QIANG Shi-zhong,REN Wei-ping,et al.Experiment of slip behavior of CFRP cable against saddle[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):395.
[11]贾布裕,颜全胜,余晓琳.考虑滑移和剪力滞的组合梁斜拉桥徐变分析[J].深圳大学学报理工版,2011,28(No.2(095-188)):136.
 JIA Bu-yu,YAN Quan-sheng,and YU Xiao-lin.Analysis of creep of composite cable stayed bridge considering the slip and shear lag effect[J].Journal of Shenzhen University Science and Engineering,2011,28(No.3(189-282)):136.

备注/Memo

备注/Memo:
收稿日期:2011-01-08;修回日期:2011-03-05
基金项目:国家自然科学基金资助项目(50078006);湖南省自然科学基金资助项目(07JJ6098)
作者简介:杨仕若(1958-),男(汉族),湖南省浏阳市人,中南林业科技大学副教授.E-mail:yangshiruo@163.com
通讯作者:曾庆元(1925-),男(汉族),中国工程院院士,中南大学教授、博士生导师.E-mail:qyzeng@mail.csu.edu.cn
更新日期/Last Update: 2011-05-22