Title:
Influence scope of blasting vibration for construction of new tunnel undercrossing existing roads
文章编号:
201703003
作者:
王睿12袁岽洋2党发宁1卢泽霖2杨战博3杨欢3邓祥辉2
1)西安理工大学土木建筑工程学院,陕西西安 710048
2)西安工业大学建筑工程学院,陕西西安 710021
3)中交第一公路工程局有限公司,北京 100085
Author(s):
Wang Rui12 Yuan Dongyang2 Dang Faning1 Lu Zelin2 Yang Zhanbo3 Yang Huan3 and Deng Xianghui2
1) School of Civil Engineering and Architecture, Xi’an University of Technology, Xi’an 710048, Shaanxi Province, P.R.China
2) School of Civil and Architecture Engineering, Xi’an Technological University, Xi’an 710021, Shaanxi Province, P.R.China
3) First Highway Engineering Bureau Co., Ltd., Beijing 100085, P.R.China
关键词:
隧道工程爆破施工爆破振动振动速度振动频率既有道路
Keywords:
highway tunnel blasting construction blasting vibration vibration velocity vibration frequency existing roads
分类号:
U 451
DOI:
10.3724/SP.J.1249.2017.03238
文献标志码:
A
摘要:
以宝汉高速爆破施工为例,通过现场监测关键质点爆破振动速度,研究爆破振动对临近既有道路的影响范围. 研究结果表明,爆破振动波的主频率在10~50 Hz内,不会使周围临近既有道路与其产生共振. 从现场测试结果可知,由于垂直振速大于径向振速和切向振速,且垂直振动对建筑物破坏尤为显著,故在类似工况下爆破振动监测应该以监测垂直振速为主. 爆破振动波对既有道路的影响范围为30 m,与理论值相符.当浅埋大断面软弱围岩隧道下穿既有道路施工爆破的安全允许质点振动速度小于2.0 cm/s时,可确保既有道路结构和交通安全.研究可为此类隧道工程的施工提供借鉴.
Abstract:
By taking the blasting construction of the Baohan highway project as an example, this paper focuses on the blasting vibration influence on the existing roads nearby by monitoring the blasting vibration velocity. The results show that existing roads nearby will not resonate with the blasting when the dominant frequency of blasting vibration is between 10-50 Hz during monitoring of tunnel blasting construction. Based on the in-situ monitoring results, the vertical vibration velocity should be principally monitored because it is higher than the radial and tangential vibration velocities and it is significantly destructive to the buildings. To ensure the safety of structures and transportation of existing roads, the blasting vibration velocities of key points are supposed to be less than 2.0 cm/s for existing roads of the shallow-buried tunnel underpass with large cross-section and soft surrounding rock. Furthermore, the monitoring data show that the influence scope of blasting vibration wave to existing roads is about 30 m, which is consistent with the theoretical calculation. These results provide references to the general tunnel construction.

参考文献/References:

[1] 曹书文, 杨耀锋, 刘俊卿. 隧道爆破施工对附近建筑物影响的评价[J]. 工业建筑, 2008, 38(S1): 1019-1021.
Cao Shuwen, Yang Yaofeng, Liu Junqing. The evaluation of the adjacent structures under the tunnel blast construction[J]. Industrial Building, 2008, 38(S1): 1019-1021.(in Chinese)
[2] 姜德义, 侯亚彬, 任松, 等. 城市大跨度隧道爆破对地面建筑物影响的研究[J]. 中国安全科学学报, 2008, 18(7): 99-104.
Jiang Deyi, Hou Yabin, Ren Song, et al. Study on the influence of urban large-span tunnel blasting on ground buildings[J]. China Safety Science Journal, 2008, 18(7): 99-104.(in Chinese)
[3] 章涛, 于广明, 邢宾, 等. 城市隧道开挖爆破对地表建筑物影响的安全评价[J]. 青岛理工大学学报, 2011, 32(5): 36-40.
Zhang Tao, Yu Guangming, Xing Bin,et al. Safey evaluation of the ground buildings under the tunnel blasting vibration[J]. Journal of Qingdao Technological University, 2011, 32(5): 36-40.(in Chinese)
[4] 侯爱军. 地铁隧道开挖爆破对地表建筑物的振动影响[J]. 四川建筑科学研究, 2010, 36(3): 154-157.
Hou Aijun. Seismic effects of blasting vibration in metro tunnel excavation [J]. Sichuan Building Science, 2010, 36(3): 154-157.(in Chinese)
[5] 王星, 曹喜仁, 刘齐建, 等. 浅埋暗挖隧道施工对临近建筑物变形的影响及加固措施[J]. 安全与环境学报, 2009, 9(4): 111-115.
Wang Xing, Cao Xiren, Liu Qijian, et al. Safety influence of shallow-buried tunnels on the nearby buildings and reinforcing measures to be taken [J]. Journal of Safety and Environment, 2009, 9(4): 111-115. (in Chinese)
[6] 孟琦, 邱明灿, 薛建峰, 等. 隧道爆破振动对临近建筑物危害的安全分析[J]. 广东化工, 2013, 40(16): 82-83.
Meng Qi, Qiu Mingcan, Xue Jianfeng, et al. Safety analysis of the damage to close buildings posed by tunnel blast vibration [J]. Guangdong Chemical Industry, 2013, 40(16): 82-83.(in Chinese)
[7] 娄建武. 普通民房爆破振动破坏分析[J]. 爆破, 2000,17(4): 8-13.
Lou Jianwu. Analysis on vibration response and damage of low-rise residential house caused by blasting [J]. Blasting, 2000, 17(4): 8-13.(in Chinese)
[8] 王利, 王海亮. 隧道爆破不同类型最大振速对建筑物的影响研究[J]. 爆破,2012, 29(4):6-9.
Wang Li, Wang Hailiang. Influence of different direction vibration peak velocity of tunnel blasting on building [J]. Blasting, 2012, 29(4): 6-9.(in Chinese)
[9] 翟才雅,李安龙,刘涛,等.花岗岩地区地铁隧道爆破振动传播规律研究[J]. 工程地质学报,2014,22(5):824-831.
Zhai Caiya, Li Anlong, Liu Tao, et al. Vibration propagtion of tunnel blasting in granite areas [J]. Journal of Engineering Geology, 2014, 22(5): 824-831.(in Chinese)
[10] 樊浩博,邱军领,谢永利,等. 下穿隧道爆破振动对地表建筑的影响[J].解放军理工大学学报自然科学版,2016,17(3):209-214.
Fan Haobo, Qiu Junling, Xie Yongli, et al. Blast-induced ground vibration from tunnel undercrossing a village [J]. Journal of PLA University of Science and Technology Natural Science Edition, 2016, 17(3): 209-214.(in Chinese)
[11] 傅洪贤,赵勇,谢晋水, 等. 隧道爆破近区爆破振动测试研究[J]. 岩石力学与工程学报, 2011, 30(2): 335-340.
Fu Hongxian, Zhao Yong, Xie Jinshui, et al. Study of blasting vibration test of area near tunnel[J]. Chinese Journal of Rock Mechanics and Engineering, 2011, 30(2):335-340.(in Chinese)
[12] 陈中学, 胡百万, 刘彦波. 隧道爆破振动对周边建筑物振动影响及减振措施研究[J]. 工程抗震与加固改造, 2012,34(4):73-75.
Chen Zhongxue,Hu Baiwan,Liu Yanbo. Research on vibration and antivibration which blasting vibration imposed on building near to tunnel [J]. Earthquake Resistant Engineering and Retrofitting, 2012, 34(4): 73-75.(in Chinese)
[13] 张志毅, 杨年华, 卢文波, 等. 中国爆破振动控制技术的新进展[J]. 爆破, 2013, 30(2):25-32.
Zhang Zhiyi, Yang Nianhua, Lu Wenbo, et al. Progress of blasting vibration control technology in China[J]. Blasting, 2013,30(2):25-32.(in Chinese)
[14] 乔雄, 陈建勋, 王梦恕, 等. 某水工隧道爆破振动对周边建筑物影响的实验分析[J].地震工程学报, 2016, 38(4):504-509.
Qiao Xiong, Chen Jianxun, Wang Mengshu, et al. Experimental analysis of influence of blasting vibration in a hydraulic tunnel on surrounding buildings [J]. China Earthquake Engineering Journal, 2016, 38(4): 504-509.(in Chinese)
[15] 陈建国. 客运专线铁路隧道下穿既有高速公路施工技术[J]. 现代隧道技术, 2010, 47(6): 62-66.
Chen Jianguo. Techniques for passenger-dedicated railway tunnel underpassing existing expressway [J]. Modern Tunnelling Technology, 2010, 47(6): 62-66.(in Chinese)
[16] 王克调, 丁任盛. 下穿既有隧道爆破震动监测技术[J]. 铁道勘察, 2009(6): 60-62.
Wang Kediao, Ding Rensheng. Technology for monitoring in construction of undergoing through existing tunnels [J]. Railway Survey, 2009(6): 60-62.(in Chinese)
[17] 夏一鸣, 郑明新, 胡国平, 等. 救援通道施工爆破对已建高铁隧道的振动安全分析[J]. 铁道标准设计, 2016, 60(3): 97-101.
Xia Yiming, Zheng Mingxin, Hu Guoping, et al. Analysis of vibration impact caused by relief channel blasting on existing high-speed railway tunnel [J]. Railway Standard Design, 2016, 60(3): 97-101.(in Chinese)
[18] 张明东. 大坪山隧道下穿既有高速公路隧道控制爆破[J]. 西部探矿工程, 2005, 109(6): 122-124.
Zhang Mingdong. The controlled blasting of Dapingshan tunnel undergoing through existing expressway [J]. West-China Exploration Engineering, 2005, 109(6): 122-124.(in Chinese)
[19] 郑俊杰, 包德勇, 龚彦峰, 等. 铁路隧道下穿既有高速公路隧道施工控制技术研究[J]. 铁道工程学报, 2006, 98(8): 80-84.
Zheng Junjie, Bao Deyong, Gong Yanfeng, et al. Research on construction control technology for railway tunnel underneath passing existing expressway tunnel [J]. Journal of Railway Engineering Society, 2006, 98(8): 80-84.(in Chinese)
[20] 张致勇. 浅埋隧道下穿既有铁路爆破施工方法[J]. 铁道建筑技术, 2008(4): 69-74.
Zhang Zhiyong. Blasting methods of shallow buried tunnel passing through the present railroad [J]. Railway Construction Technology, 2008(4): 69-74.(in Chinese)
[21] 沈聚敏, 周锡元, 高小旺, 等. 抗震工程学[M]. 北京:中国建筑工业出版社, 2000.
Shen Jumin, Zhou Xiyuan, Gao Xiaowang, et al. Anti-knock engineering [M]. Beijing: Chinese Building Industry Press, 2000.(in Chinese)
[22] GB 6722—2014 爆破安全规程[S].
GB 6722—2014 Safety regulations for blasting [S].(in Chinese)
[23] 许海亮, 张继春, 杨红, 等. 钻孔爆破振动速度计算公式及其简化的探讨[J]. 同济大学学报自然科学版, 2007, 35(7): 899-903.
Xu Hailiang, Zhang Jichun, Yang Hong, et al. Investigation on calculating formula of vibration velocity in drilling blasting and its simplification [J]. Journal of Tongji University Natural Science, 2007, 35(7): 899-903.(in Chinese)
[24] 许海亮, 张继春, 郭建群. 钻孔爆破中质点振动速度的预测公式探讨[J]. 爆破, 2003, 20(3): 75-78.
Xu Hailiang, Zhang Jichun, Guo Jianqun. Investigation on formula of predicting the particle vibration velocity in drilling blasting [J]. Blasting, 2003, 20(3): 75-78.(in Chinese)
[25] 葛克水. 爆破振动的计算方法初探[J]. 探矿工程, 2003(S1): 299-300.
Ge Keshui. Discussion on calculation methods for blasting vibration [J]. Exploration Engineering, 2003(S1): 299-300.(in Chinese)

相似文献/References:

[1]邱明明,杨果林,姜安龙.盾构隧道同步注浆的压力分布及其影响因素[J].深圳大学学报理工版,2015,32(2):162.[doi:10.3724/SP.J.1249.2015.02162]
 Qiu Mingming,Yang Guolin,and Jiang Anlong.Influence factors and pressure distribution of simultaneous grouting for shield tunnel[J].Journal of Shenzhen University Science and Engineering,2015,32(3):162.[doi:10.3724/SP.J.1249.2015.02162]
[2]王飞,等.有限场地条件下盾构机整体吊装技术研究[J].深圳大学学报理工版,2016,33(3):317.[doi:10.3724/SP.J.1249.2016.03317]
 Wang Fei,Liu Mengbo,et al.Integral hoisting technology of tunnel boring machine in limited space[J].Journal of Shenzhen University Science and Engineering,2016,33(3):317.[doi:10.3724/SP.J.1249.2016.03317]
[3]邱明明,杨果林,姜安龙,等.地铁盾构施工地层变形预测及数值分析[J].深圳大学学报理工版,2016,33(4):377.[doi:10.3724/SP.J.1249.2016.04377]
 Qiu Mingming,Yang Guolin,Jiang Anlong,et al.Numerical analysis of stratum deformation induced by tunnel boring machine construction for metro[J].Journal of Shenzhen University Science and Engineering,2016,33(3):377.[doi:10.3724/SP.J.1249.2016.04377]
[4]王志超,甘露,赖金星,等.盾构下穿铁路路基钢轨变形及路基沉降分析[J].深圳大学学报理工版,2018,35(4):389.[doi:10.3724/SP.J.1249.2018.04389]
 WANG Zhichao,GAN Lu,LAI Jinxing,et al.Analysis of track deformation and subgrade settlement of shield tunnel construction crossing existing railway[J].Journal of Shenzhen University Science and Engineering,2018,35(3):389.[doi:10.3724/SP.J.1249.2018.04389]

备注/Memo

备注/Memo:
Received:2016-10-03;Accepted:2017-01-05
Foundation:National Natural Science Fundation of China (51679199); Key Laboratory Project of Shaanxi Science & Technology Co-ordination & Innovation Project (2014SZS15-Z01); Principal Foundation Program of Xi’an Technological University (XAGDXJJ16003)
Corresponding author:Professor Dang Faning.E-mail: dangfn@163.com
Citation:Wang Rui, Yuan Dongyang, Dang Faning,et al.Influence scope of blasting vibration for construction of new tunnel undercrossing existing roads[J]. Journal of Shenzhen University Science and Engineering, 2017, 34(3): 238-244.(in Chinese)
基金项目:国家自然科学基金资助项目(51679199);陕西省科技统筹创新工程重点实验室资助项目(2014SZS15-Z01);西安工业大学校长基金资助项目(XAGDXJJ16003)
作者简介:王睿(1981—),男,西安工业大学讲师、博士研究生.研究方向:岩土与隧道工程.E-mail:wangrui@xatu.edu.cn
引文:王睿,袁岽洋,党发宁,等.新建隧道下穿既有道路爆破施工影响范围[J]. 深圳大学学报理工版,2017,34(3):238-244.
更新日期/Last Update: 2017-04-20