相似文献/References:
[1]朱美春,刘建新,王清湘.钢骨-方钢管高强混凝土柱的轴压比限值[J].深圳大学学报理工版,2010,27(1):95.
ZHU Mei-chun,LIU Jian-xin,and WANG Qing-xiang.Axial load limit for square steel tubes filled with steel-reinforced high-strength concrete[J].Journal of Shenzhen University Science and Engineering,2010,27(5):95.
[2]周海俊,米红雨,谭也平.锈蚀-疲劳作用下的砼梁桥失效概率分析[J].深圳大学学报理工版,2010,27(1):109.
ZHOU Hai-jun,MI Hong-yu,and TAN Ye-ping.Failure probability analysis of reinforced concrete bridges under coupled corrosion fatigue effects[J].Journal of Shenzhen University Science and Engineering,2010,27(5):109.
[3]李宏江,张劲泉,李万恒,等.PC斜拉桥辅助墩拉力摆断裂后的状态模拟[J].深圳大学学报理工版,2010,27(3):280.
LI Hong-jiang,ZHANG Jin-quan,LI Wan-heng,et al.Simulation on the state after fracture of tension rocker bearing cables at auxiliary piers in a PC cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2010,27(5):280.
[4]白音,石永久,王元清.火灾中网架结构受力分析与设计方法[J].深圳大学学报理工版,2011,28(No.2(095-188)):113.
BAI Yin,SHI Yong-jiu,and WANG Yuan-qing.Mechanical properties analysis and design method for grid structures under fire conditions[J].Journal of Shenzhen University Science and Engineering,2011,28(5):113.
[5]贾布裕,颜全胜,余晓琳.考虑滑移和剪力滞的组合梁斜拉桥徐变分析[J].深圳大学学报理工版,2011,28(No.2(095-188)):136.
JIA Bu-yu,YAN Quan-sheng,and YU Xiao-lin.Analysis of creep of composite cable stayed bridge considering the slip and shear lag effect[J].Journal of Shenzhen University Science and Engineering,2011,28(5):136.
[6]管民生,韩大建,杜宏彪,等.钢筋混凝土框架结构的抗震性能指标研究[J].深圳大学学报理工版,2011,28(No.3(189-282)):200.
GUAN Min-sheng,HAN Da-jian,DU Hong-biao,et al.A new seismic performance index for reinforced concrete frame structures[J].Journal of Shenzhen University Science and Engineering,2011,28(5):200.
[7]蔡健,林焕彬,侯磊,等.带约束拉杆矩形钢管混凝土短柱延性分析[J].深圳大学学报理工版,2011,28(No.3(189-282)):213.
CAI Jian,LIN Huan-bin,HOU Lei,et al.Analysis of ductility of rectangular concrete-filled steel tube stub columns with binding bars subjected to eccentric loading[J].Journal of Shenzhen University Science and Engineering,2011,28(5):213.
[8]方明霁,李国强,李一松.型钢混凝土中高剪力墙的抗震性能[J].深圳大学学报理工版,2012,29(No.1(001-094)):38.[doi:10.3724/SP.J.1249.2012.01038]
FANG Ming-ji,LI Guo-qiang,and LI Yi-song.Seismic behavior of steel reinforced concrete mid-rise shear wall[J].Journal of Shenzhen University Science and Engineering,2012,29(5):38.[doi:10.3724/SP.J.1249.2012.01038]
[9]蔡健,梁伟盛,林辉.方钢管混凝土柱抗剪性能试验研究[J].深圳大学学报理工版,2012,29(No.3(189-282)):189.[doi:10.3724/SP.J.1249.2012.03189]
CAI Jian,LIANG Wei-sheng,et al.Experimental study on shear resistance performance of concrete filled square steel tubular columns[J].Journal of Shenzhen University Science and Engineering,2012,29(5):189.[doi:10.3724/SP.J.1249.2012.03189]
[10]张成,吴慧,高博青,等.肋环型索穹顶结构的几何法施工及工程应用[J].深圳大学学报理工版,2012,29(No.3(189-282)):195.[doi:10.3724/SP.J.1249.2012.03195]
ZHANG Cheng,WU Hui,GAO Bo-qing,et al.Geometry-based construction technique and application of Geiger type cable dome[J].Journal of Shenzhen University Science and Engineering,2012,29(5):195.[doi:10.3724/SP.J.1249.2012.03195]
[11]赵晓晋,贺拴海,李源,等.斜拉桥前支点挂篮施工过程模拟分析[J].深圳大学学报理工版,2017,34(2):138.
Zhao Xiaojin,He Shuanhai,Li Yuan,et al. Simulate analysis of fore fulcra form travelers construction process for cable-stayed bridge[J].Journal of Shenzhen University Science and Engineering,2017,34(5):138.